Yu Zezhong. A PREDICTION ABOUT THE EFFECT OF THE BUILDING OF SHUIKOU HYDROPOWER STATION ON THE ECOLOGICAL ENVIRONMENT OF THE MIDDLE-LOWER REACHES OF THE MINJIANG RIVER[J]. Chinese Geographical Science, 1991, 1(3): 248-261.
Citation: Yu Zezhong. A PREDICTION ABOUT THE EFFECT OF THE BUILDING OF SHUIKOU HYDROPOWER STATION ON THE ECOLOGICAL ENVIRONMENT OF THE MIDDLE-LOWER REACHES OF THE MINJIANG RIVER[J]. Chinese Geographical Science, 1991, 1(3): 248-261.

A PREDICTION ABOUT THE EFFECT OF THE BUILDING OF SHUIKOU HYDROPOWER STATION ON THE ECOLOGICAL ENVIRONMENT OF THE MIDDLE-LOWER REACHES OF THE MINJIANG RIVER

  • Publish Date: 1991-09-20
  • The building of Shuikou Hydropower Station in the Minjiang River is the largest one in the region of east China. Its install capacity is 1.4 million kw., and its generated energy of planning is 4.95 billion kwh each year. In accordance with a comprehensive survey of the valley of the middle-lower reaches of the Minjiang River and the characteristic of hydrography and in association with the specific type of the hydrography station, we can be sure that no harm will be done to the ecological environment when a hydropower station is built at Shuikou. Not only the deposition of silt within the reservoir must not be very serious, it is also more favorable than before for the irrigation of farmland on plains in the lower reaches of the Minjiang River and inland navigation.In addition, after the completion of the power station, the ecological environment will be the same as before both at the Minjiang River estuary and beyond it.
  • 加载中
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Article Metrics

Article views(749) PDF downloads(951) Cited by()

Proportional views
Related

A PREDICTION ABOUT THE EFFECT OF THE BUILDING OF SHUIKOU HYDROPOWER STATION ON THE ECOLOGICAL ENVIRONMENT OF THE MIDDLE-LOWER REACHES OF THE MINJIANG RIVER

Abstract: The building of Shuikou Hydropower Station in the Minjiang River is the largest one in the region of east China. Its install capacity is 1.4 million kw., and its generated energy of planning is 4.95 billion kwh each year. In accordance with a comprehensive survey of the valley of the middle-lower reaches of the Minjiang River and the characteristic of hydrography and in association with the specific type of the hydrography station, we can be sure that no harm will be done to the ecological environment when a hydropower station is built at Shuikou. Not only the deposition of silt within the reservoir must not be very serious, it is also more favorable than before for the irrigation of farmland on plains in the lower reaches of the Minjiang River and inland navigation.In addition, after the completion of the power station, the ecological environment will be the same as before both at the Minjiang River estuary and beyond it.

Yu Zezhong. A PREDICTION ABOUT THE EFFECT OF THE BUILDING OF SHUIKOU HYDROPOWER STATION ON THE ECOLOGICAL ENVIRONMENT OF THE MIDDLE-LOWER REACHES OF THE MINJIANG RIVER[J]. Chinese Geographical Science, 1991, 1(3): 248-261.
Citation: Yu Zezhong. A PREDICTION ABOUT THE EFFECT OF THE BUILDING OF SHUIKOU HYDROPOWER STATION ON THE ECOLOGICAL ENVIRONMENT OF THE MIDDLE-LOWER REACHES OF THE MINJIANG RIVER[J]. Chinese Geographical Science, 1991, 1(3): 248-261.

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return